ALBERTA-PACIFIC LANDFILL LEAK LOCATION IN BOYLE, ALBERTA, CANADA
Cell 3B was built during the summer of 2020. This phase had an area of approximately 44,000 m², all tested with water puddle method. Only the geomembrane under the perforated drains (most critical areas) was tested with the dipole method.
Date:
2020
Location:
Boyle, Alberta, Canada
Project type:
WASTE / landfill
Client:
BTO Contracting
Services:
Water Puddle and Dipole
Keywords:
Leak Location, ELL, Boyle, landfill, water puddle, dipole