DIPOLE LEAK LOCATION AT STABLEX CANADA
Today, Stablex has set the international benchmark for managing
industrial waste. It is committed to remaining the North
American industry leader in environmental management by pursuing
research and development, continually implementing new
improvement programs and fostering enthusiasm and dedication
among its seasoned professionals.
Groupe Alphard were mandated to validate a geomembrane layer
installed during the 2013 extension of the Stablex site’s final
cap. A dipole method electrical leak location survey (ASTIM
D7007) was completed across the total area of the site.